Customer:

SOMESHWAR GRAPHICS AND PRINTS PRIVATE LIMITED

Project Category:

INDUSTRIAL - TURNKEY FIRE FIGHTING PROJECT

Customer Requirement:

The client required a reliable and fully compliant fire safety system within a tight timeline to meet statutory and audit requirements, including Fire NOC approvals. In many cases, the interiors or manufacturing operations were already in place, so the challenge was to execute the project without disturbing ongoing work or damaging the finished interiors. The client also emphasized high-quality, branded products and professional execution to ensure long-term safety, supply chain compliance, and readiness for inspections.

Project Result:

COMPLETED SUCCESSFULLY

What we did:

1. Appointed architect/technical experts to prepare as-built drawings and support approvals. 2. Obtained provisional and final Fire NOC from the respective fire authorities. 3. Executed complete design, supply, installation, testing, commissioning, and compliance documentation. 4. Provided Annual Maintenance Contract (AMC) for long-term reliability of the fire systems. 5. Installed fire hydrant, sprinkler, alarm, suppression, and pump systems ensuring full coverage. 6. Established dedicated pump room and water tank with required backup systems. 7. Installed additional systems like medium velocity spray, water curtain, tube suppression, and fire doors as per hazard analysis. 8. Ensured seamless installation without affecting existing interiors or ongoing operations. 9. Delivered a complete **end-to-end turnkey fire safety solution** ready for audits and long-term use.

Project Description

We executed a turnkey fire safety project covering complete SITC (Supply, Installation, Testing & Commissioning) of advanced fire protection systems. The project scope included fire hydrant system, automatic fire sprinkler system, fire pump room, fire water storage tank, portable fire extinguishers, addressable fire alarm system, medium velocity spray system, water curtain system, tube suppression system, and certified fire-rated doors. Whether greenfield or brownfield, our execution ensured statutory compliance, Fire NOC approvals, and adherence to national and international fire safety standards while maintaining aesthetics and uninterrupted client operations.

Project Budget:

6800000

Completion Date:

2025-10-05T00:00:00